In the February 1994 study, mean traveltime from the Merced River at River Road to the San Joaquin River near Vernalis (46.8 river miles) was 38.5 hours, and to the Delta-Mendota Canal at Tracy pumps (84.3 river miles) was 90.4 hours. In the June 1994 study, mean traveltime from Salt Slough at Highway 165 to Vernalis (64.0 river miles) was 80.1 hours. In the February 1995 study, the mean traveltime from the Tuolumne River at Roberts Ferry to Vernalis (51.5 river miles) was 35.8 hours. For the 1994 studies, the regression equations provided suitable estimates of traveltime, with ratios of estimated traveltime to mean dye traveltime of 0.94 to 1.08. However, for the 1995 dye studies, the equations considerably underestimated traveltime, with ratios of 0.49 to 0.73.
In the February 1994 study, 70 percent of the dye released was recovered at Vernalis and 35 percent was recovered at the Delta-Mendota Canal at Tracy pumps. In the June 1994 study, recovery was 61 percent at Patterson, 43 percent just upstream of the Tuolumne River confluence, and 37 percent at Vernalis. The dye-dosage formula overestimated the dye required for a given downstream concentration for the 1994 studies by ratios of 1.07 to 2.12. The ratios for the February 1995 studies were 0.67 to 0.95 for the Tuolumne River and 1.21 for Dry Creek. In all studies, the estimates improved with length of dye study.
Contents
Abstract
Introduction
Sampling Design and Methodology
Traveltimes Determined from Dye-Tracer Studies
February 1994 Study
June 1994 Study
February 1995 Study
Traveltimes Estimated by Regression Equations
Dye Recoveries
Evaluation of the Dye-Dosage Formula
Summary and Conclusions
Referenced Cited